Do we need notices publicising this (disconnecting the coaches before moving them) - at the signing on point / in the loco / elsewhere (even in the appropriate procedures for shunting in the SMS)? Regardless, sure as eggs are eggs the inevitable will happen one day!BrummieGeorge wrote: ↑Mon Jan 29, 2024 8:19 pm Further work has been carried out on the electrification of the MK1
We now have 4 Double 240 volt sockets in the MKI.
Keith has made a link to the MKII power feed with a plug which enables us to detach the cables to allow the coach to be moved when required.
Work in Progress
-
- Paid up Member
- Posts: 205
- Joined: Wed Feb 02, 2022 8:39 pm
- Real Name: Adrian Lewis
- Are you human?: Yes
Re: Work in Progress
-
- Paid up Member
- Posts: 3048
- Joined: Wed Jan 07, 2009 12:51 pm
Re: Work in Progress
Saturday 3rd February.
Another cracking day at Fimber Halt.
We cut and drilled the remaining two rails. This section now needs a bit of packing and 2 pairs of stepped fish plates.
We managed to move about 20 concrete sleepers down to the Pway area.
Another cracking day at Fimber Halt.
We cut and drilled the remaining two rails. This section now needs a bit of packing and 2 pairs of stepped fish plates.
We managed to move about 20 concrete sleepers down to the Pway area.
Onwards and upwards.
-
- Paid up Member
- Posts: 205
- Joined: Wed Feb 02, 2022 8:39 pm
- Real Name: Adrian Lewis
- Are you human?: Yes
Re: Work in Progress
Are we looking at stepped fishplates for bullhead to bullhead or bullhead to flat bottom? I think that there might be an odd one or two of the latter on one of the pallets in the PW area in F2. If there are I'll bring them up on Wed.menticknap wrote: ↑Sat Feb 03, 2024 4:49 pm Saturday 3rd February.
We cut and drilled the remaining two rails. This section now needs a bit of packing and 2 pairs of stepped fish plates.
Adrian
-
- Paid up Member
- Posts: 3048
- Joined: Wed Jan 07, 2009 12:51 pm
Re: Work in Progress
BH to BH Adrian.
We had a look but we are pretty sure we have none.
We had a look but we are pretty sure we have none.
Onwards and upwards.
-
- Paid up Member
- Posts: 466
- Joined: Mon Aug 22, 2016 7:51 pm
- Real Name: David G Purnell
- Are you human?: Yes
- Location: Pontefract
Re: Work in Progress
Steve knows what we have and haven't, he is sourcing some from elsewhere.
- Turnip Town
- Infrastructure Director/Secretary/Treasurer
- Posts: 4296
- Joined: Wed Dec 24, 2008 1:10 am
Re: Work in Progress
A pic or two of current progress with positioning the signal lever frame and installing the cabin floor joists.
Ivan Merino
Infrastructure Director/Treasurer
Infrastructure Director/Treasurer
- chalkie
- Paid up Member
- Posts: 5431
- Joined: Sun Apr 18, 2010 6:00 pm
- Real Name: ted
- Are you human?: Yes
Re: Work in Progress
The joist circled in red will in future be removed, this will allow the locking trays to be placed on the bearers
- Rail Rover
- Finance and Legal Director
- Posts: 5906
- Joined: Wed Dec 24, 2008 1:10 am
- Are you human?: No
- Location: Driffield
- Rail Rover
- Finance and Legal Director
- Posts: 5906
- Joined: Wed Dec 24, 2008 1:10 am
- Are you human?: No
- Location: Driffield
Re: Work in Progress
One of our training day was held yesterday - here are a few pictures:
If you think you could offer some of your time on a running day (mainly Sundays in the season), please contact us
email eddie@yorkshirewoldsrailway.org.uk, or phone 01377 338053, or visit our contact page https://www.yorkshirewoldsrailway.org.uk/contact/
If you think you could offer some of your time on a running day (mainly Sundays in the season), please contact us
email eddie@yorkshirewoldsrailway.org.uk, or phone 01377 338053, or visit our contact page https://www.yorkshirewoldsrailway.org.uk/contact/
Phil Robson
Finance and Legal Director
Finance and Legal Director