Work in Progress

User avatar
4008
Membership, Media and Archive Director
Posts: 9023
Joined: Wed Dec 24, 2008 12:21 am

Re: Work in Progress

Post by 4008 »

Great job Ian! Thanks
Matthew Brown
Member/Media/Archive Director
User avatar
Rail Rover
Finance and Legal Director
Posts: 5906
Joined: Wed Dec 24, 2008 1:10 am
Are you human?: No
Location: Driffield

Re: Work in Progress

Post by Rail Rover »

It’s nice to see an update in “Trackside” magazine this month 8-)


IMG_4463.jpeg
Phil Robson
Finance and Legal Director
User avatar
BrummieGeorge
Diesel Traction Director
Posts: 112
Joined: Mon Jul 29, 2019 8:39 pm
Real Name: George Bailey
Are you human?: Yes
Location: Tibthorpe
Contact:

MK1 Electrics

Post by BrummieGeorge »

Keith, Richard and myself have been working on the mains electric supply to the MK1.

Keith has provided a cable supply from the Generator through to the north end of the MK1 and connected it into a power socket behind Santa's grotto.
DSCF2839.JPG

Richard and I have run a cable through the ducting on then ceiling of the MK1 to the junction box where the solar power connects to the coach.

DSCF2841.JPG

We have also run conduit to supply power from this junction box to the model railway and prepare for connection to the lighting planned for the velocipede. We will be putting another cable through to the video suite
DSCF2840.JPG
George Bailey
Diesel Traction Director
User avatar
g.89
Paid up Member
Posts: 3127
Joined: Sun Jan 27, 2013 5:39 pm
Real Name: Alan Cooper
Are you human?: Yes
Location: CRANSWICK

Re: Work in Progress

Post by g.89 »

Good work lads!
By Alan Cooper
Skipper
Paid up Member
Posts: 466
Joined: Mon Aug 22, 2016 7:51 pm
Real Name: David G Purnell
Are you human?: Yes
Location: Pontefract

Re: Work in Progress

Post by Skipper »

A busy day on site today
We welcomed a new member into the pway team Simon from the Levisham group.
We started on the removal of the redundant rail in the platform area.
All the rails were turned out today and three replacement 60fts were turned back in on the road side and a lined.
We then removed the chair screws on the double chairs , these will be replaced with single chairs S1s.
20240103_085614.jpg
Attachments
20240103_150911.jpg
Skipper
Paid up Member
Posts: 466
Joined: Mon Aug 22, 2016 7:51 pm
Real Name: David G Purnell
Are you human?: Yes
Location: Pontefract

Re: Work in Progress

Post by Skipper »

Before and after photo's
menticknap
Paid up Member
Posts: 3048
Joined: Wed Jan 07, 2009 12:51 pm

Re: Work in Progress

Post by menticknap »

Saturday 6th January. What a cracking day even though we got wet and cold, the hard work kept us from pneumonia ;)
After the excellent propriety work on Wednesday, it was up to Saturday's Pway gang to replace some rail.
First of all, we straightened the slightly wobbly rails to the West. This was to be used as a gauge to install the Eastern rails.
The eastern side already had the check chairs unscrewed ready for single chair installation. So, single chairs had to be picked up from the yard and each chair placed in position on each sleeper.
Redundant holes were plugged. Easy to type, exhausting to do!
Each replacement rail was rotated into it's correct alignment with two chairs installed on the rail (upside down).
The rail was then lifted and the remaining chairs slid into position.
Gauge up, drill and screw each chair and we are done for the day.
We realised that a few sleepers needed shifting, otherwise the rail joint would be on a sleeper. Shifting ballast is also a back breaking job. Come and have a go if you think you are 'ard enough. ;)
It's so rewarding to look back to see what we have accomplished.
We are not finished yet though. Plenty of work to continue before finished in the platform area.
Today's gang were, Dave, Steve, Brian, Ed, Maffers, Simon and Lee.
Keep in touch everyone. We even had visitors interested to find out what is happening and generously donated after a quick tour by me, Matthew (Maffers). Don't be afraid! Pop in and say Hello if people are about.
Attachments
End of the day
End of the day
Plugging the holes
Plugging the holes
Onwards and upwards.
User avatar
g.89
Paid up Member
Posts: 3127
Joined: Sun Jan 27, 2013 5:39 pm
Real Name: Alan Cooper
Are you human?: Yes
Location: CRANSWICK

Re: Work in Progress

Post by g.89 »

These lads are the bees knees. You can’t have a railway without rails so these lads are at the top of the tree when you talk about volunteers.
You can’t have a railway without money and they even managed to raise a donation today as well.

Great work from great guys!!
By Alan Cooper
User avatar
4008
Membership, Media and Archive Director
Posts: 9023
Joined: Wed Dec 24, 2008 12:21 am

Re: Work in Progress

Post by 4008 »

Great work and report. Thanks!
Matthew Brown
Member/Media/Archive Director
andybat48
Paid up Member
Posts: 1619
Joined: Fri Mar 09, 2018 5:17 pm
Real Name: Andrew Batty
Are you human?: Yes

Re: Work in Progress

Post by andybat48 »

The Pway gang are to a large degree the linchpin of the railway, without them. nothing happens. Great work guys.